4-26-23
Went up to the lookout to do some maintenance. Tassajara Rd. was in good condition all the way to the gate, having just been graded. Met the FS Law Enforcement on the road. He was on his way back toward the Zen Center.
The gate was locked and the tower secure. The road past the gate to the “Y” going to MIRA has not been worked on and leaves a lot to be desired.
Finished the work on the outhouse. All three boards are up and the wild animal pole is hanging back on the hooks.
Replaced the four broken windows.
The lookout is drying nicely but we didn’t do any work on the ceiling this trip.
Jess Mason #42